Xinjiang Ruoqiang Construction


The 4th Geological Brigade of North China Geological Exploration Bureau will construct in Ruoqiang, Xinjiang in 2024, using our C1300 drilling rig. Mining area characteristics, harsh environment, inconvenient transportation, no man's land, high altitude, hard core, exploration of lithium ore; 85 degree opening, 4200m above sea level, NQ final hole depth 800m within the effective construction period of about 5 months, the total depth of drilling is more than 3500 meters